Based on the traction
teste, the team got the shear stress of material, according the theory of Von
Mises- Hencky. With thate, the team got the rivet with a total área of 267.467 mm2.
The diamter of this rivet is 18.45 milimeter
Based on established
limits by SENAI CIMATEC, figure 1, the team was concluded that one rivet pass
the limits. Therewith, decided to use 5 rivets, eatch with 8.25 milimeter of
diameter. The new layout is showed in figure 2.
Figure 1: Joint placement
![]() |
Figure 2- Riveted joint CAD 3D
![]() |
Source:Own |
The team knew the aluminium contract after the
foundry. Because this, based on figure 3, was calculated your contraction. The
contraction will be taken into account are solidification and solid. The
liquidate was disregarded because of the use of riser.
Figure 3: Non ferrous metals
shrinkage during cooling.
![]() |
Source: Verran |
The aluminium will be
contract 12.2%. The team chose to do in the molde, holes with a drill bit of 9
milimeter because of the contraction.
Bibliography:
NORTON, Robert. Projeto de máquinas. 4. Ed. Porto Alegre: Bookman, 2013. 1030 p.
VERRAN, Guilherme Ourique. Estudo da alimentação de peças fundidas em ligas de alumínio. 1986. 188 p. Dissertação (Mestrado em Metalurgia e Transformação) - Escola de Engenharia, Universidade Federal do Rio Grande do Sul, 1986.